BW Vinh Loc 2

Area A1 + C2, Vinh Loc 2 IP, National Highway 1, Voi La Hamlet
Building Information
Industrial Park

Vinh Loc 2 IP

Project Name

BW Vinh Loc 2 - RBF

Total Area

109,000m2

Floor Loading

2.5-3 tons/m2

Building Structure

Multiple-storey with ramps

Cargo Lifts (Ton/sqm)

TBC

Dock Leveler

50% equipped & 50% reserved dock pit

Power Capacity

180 VA/m2

Ceiling Height

9m

Unit Size

From 5,700m2

Fire Fighting System

Class C: ESFR sprinkler comply to NFPA13, smoke exhaust, emergency lighting, fire alarm, fire hose reel, fire extinguishers, ASD system

Overview

BW Vinh Loc 2 RBF is a modern ready-built factory project developed by BW Industrial within Vinh Loc 2 Industrial Park, strategically located along National Highway 1A in Long Hiep Commune, Tay Ninh Province. Positioned near the Ho Chi Minh City – Trung Luong Expressway, the project offers convenient connectivity to Ho Chi Minh City, Cat Lai Port, Tan Son Nhat International Airport, and other key industrial and logistics hubs in Southern Vietnam. The development is designed to serve a wide range of industries including light manufacturing, logistics, e-commerce, cold storage, and third-party logistics (3PL) operations.

The project features a total land area of approximately 10–10.9 hectares with a modern double-storey factory and warehouse design. BW Vinh Loc 2 offers a total gross floor area (GFA) of around 105,000 sqm, providing flexible leasing options suitable for both domestic and international manufacturers. The factories are built to international industrial standards with clear ceiling heights of 9 meters for both ground and upper floors, floor loading capacities of up to 3 tons/sqm on the ground floor and 2.5 tons/sqm on upper levels, as well as ramp access for efficient logistics operations. The project also incorporates wide loading bays, dock levelers, sectional doors, spacious maneuvering areas, and two-storey office spaces integrated within each factory unit to optimize operational efficiency.

In addition to its modern structure, BW Vinh Loc 2 RBF is developed with a strong focus on sustainability and operational quality. The project is targeting LEED Gold certification and integrates environmentally friendly features such as low-emission construction materials, energy-efficient systems, and solar-powered lighting. The factories are equipped with ESFR sprinkler systems compliant with NFPA 13 standards, 24/7 security with CCTV monitoring, stable power supply infrastructure, and professionally managed internal facilities. With its institutional-grade specifications and strategic location, BW Vinh Loc 2 RBF is positioned as one of the leading ready-built industrial developments in Southern Vietnam.

Proximities:

  • Strategically located within Vinh Loc 2 Industrial Park, providing convenient access to key manufacturing hubs in southern Vietnam.
  • Approximately 15–20 minutes to the center of Tan An City.
  • Around 45–60 minutes to Ho Chi Minh City via major expressways and arterial routes.
  • Convenient connectivity to Long An International Port and major logistics centers in the region.
  • Accessible to Tan Son Nhat International Airport within about 60–75 minutes.
  • Surrounded by established industrial parks, supporting a strong supply chain and labor network.
Location

Nhung Vu

Director

Leasing Advisory & Transactions

Other Buildings